AZOVA Sleep Care for Health Plans and Employers
Wake up to a healthier team and a stronger bottom line.
Don’t let sleep disorders drive chronic disease and your healthcare costs. Experience the difference a well-rested workforce can make.

The high price of poor sleep
Sleep-deprived
workers miss work twice as often.2
Undiagnosed sleep apnea
leads to $86.9 billion in lost productivity.3
Insomnia
increases the risk of a heart attack by 70%.1

The complete sleep solution for your team
Access to board-certified providers
Connect employees virtually with sleep experts.
Convenient diagnostic at-home sleep testing
Enable your employees to get tested for sleep disorders from the comfort of their own homes.
Comprehensive sleep management
Get your employees the sleep equipment, coaching, and ongoing monitoring that they need.
CBT-i based Sleep Coaching for Insomnia
Insomnia is the most common sleep disorder driving chronic disease and mental health problems. CBT-i methodologies are the most effective and drug-free way to treat insomnia.

The Future of Sleep Medicine
Level 3 HSAT PSG-grade data—including respiratory effort, airflow, SPO2, heart rate, and more. Go beyond the basic with advanced insights like hypoxic burden, sleep staging, and leg movement analysis—giving providers a richer, clinically-relevant picture of their patients’ sleep health.
Level 3 HSAT PSG-Grade Data Signals Include:
Gain Deeper Insights with These Additional Signal:

The Easiest and Most Comfortable Home Sleep Test.
Discover what makes the AZOVA Home Sleep Test with Wesper technology a groundbreaking innovation in sleep diagnostics.
Get AZOVA Sleep Care for Your Members.

For Your Members and Employees
AZOVA Sleep Care
AZOVA offers an end-to-end sleep solution for your team. Our technology is designed to mitigate the cost of chronic disease through sleep optimization. Now you have a one stop solution to make this happen.

For Employers and Health Plans
End to End Sleep Care. A single Vendor.
AZOVA manages all sleep disorders–not just sleep apnea. From insomnia, to restless legs, to sleep apnea, AZOVA manages all sleep disorders. Care navigation, Sleep DME and Sleep coaching are all included.
TRADITIONAL SLEEP TESTING VS. THE AZOVA HOME SLEEP TEST
Never Compromise the Patient Experience.
Traditional sleep studies typically require an overnight stay in a lab, where patients are connected to bulky equipment that can interfere with normal sleep. These tests are often expensive, inconvenient, and come with long wait times for both scheduling and results. AZOVA provides a smarter, more modern solution: a clinically validated at-home sleep test that uses a comfortable, wireless patch to collect high-resolution data over one or more nights. Paired with an easy-to-use app, AZOVA offers a more accurate, accessible, and patient-friendly way to diagnose sleep disorders.

vs.

45 Longitudinal Trends
With faster results you can trust, Wesper’s autoscored reports and overscoring capabilities bring confidence and clarity to every step of the sleep care journey. The AZOVA home sleep test delivers fast, reliable results with autoscored reports and expert overscoring, providing clarity and confidence at every stage of the sleep care journey.
Real-time, Clinical-Grade Insights on Patient Progress

What’s the value?
Lower medical costs
Preempt adverse events by addressing a root cause of heart disease, mental health issues, diabetes, asthma, and more.
Increase employee productivity
Enhance focus, alertness, and cognitive function, leading to improved performance and reduced absenteeism.
Gain a competitive edge
Attract and retain top talent by offering a unique and valuable employee benefit.
Improve workplace safety
Reduce the risk of accidents and life-threatening events by improving employee daytime alertness.

Want to learn more?
Elevate your workforce’s well-being
See how AZOVA Sleep Care can help your organization improve sleep quality, reduce healthcare costs, and boost productivity for your members.



